Posted On: 11/18/2013 9:20:53 PM
Post# of 39368
DTL: There are two possibilities (as I see it): (1) we do not desire to do anything that could possibly damage the integrity of the casing; (2) there is a private agenda at work (to which I am not privy) which is in fact benefitted to some measure by actually not completing the SJ #3; let me read all the contracts and drill logs and I'll have a better opinion. Oiljob
(0)
(0)
Scroll down for more posts ▼