Posted On: 11/01/2013 1:15:37 AM
Post# of 43065
Re: SaulGoodman #5779
Saul: It is very apparent to me that JB has involved qualified engineers to assist with the development of the processor right from day 1. This has NEVER been an issue with me. The current state of the processor is the result of their involvement.
Now they must address the final issues that might be preventing the machine from running at profitable throughput rates. I believe they can do this, but it is not at all clear if it can be done for a variable enough range of available feedstocks, if any. We have no idea the ratio of HTF to plastic that was used during the 30 days of up time that was reported.
So we wait for more information. I am not pleased that the new management has not been more open about where they are with their testing. Hopefully that changes with this CC.
4kids: One more question for the CC:
If throughput is reported as generating X barrels of fuel per hour, what is the ratio of HTF to plastic that was used to report X?
Now they must address the final issues that might be preventing the machine from running at profitable throughput rates. I believe they can do this, but it is not at all clear if it can be done for a variable enough range of available feedstocks, if any. We have no idea the ratio of HTF to plastic that was used during the 30 days of up time that was reported.
So we wait for more information. I am not pleased that the new management has not been more open about where they are with their testing. Hopefully that changes with this CC.
4kids: One more question for the CC:
If throughput is reported as generating X barrels of fuel per hour, what is the ratio of HTF to plastic that was used to report X?
(0)
(0)
techisbest
Scroll down for more posts ▼