Posted On: 10/26/2013 12:33:20 AM
Post# of 39368
Facebook update
For those who dont have FB :
Important Shareholder Information: Just to let everyone know, we've had a really busy week. We've been constantly communicating with the TRRC to get the Mitchell #5 permit approved. We've had to apply for an exemption which requires the sign off from the landowner (SWR 38) and a site inspection. Crews are standing by on all fronts and ready to drill the Mitchell #5 and complete the Stockton #2.
... We've also been working diligently to get the 10-Q finalized, something that is absolutely critical. The Belize packet will be released in Monday's newsletter next week, along with a comprehensive status update on all operations. We're committed to transparency, we're just all hands on deck at the moment making sure stuff gets done!
Go TECO, Go!
... We've also been working diligently to get the 10-Q finalized, something that is absolutely critical. The Belize packet will be released in Monday's newsletter next week, along with a comprehensive status update on all operations. We're committed to transparency, we're just all hands on deck at the moment making sure stuff gets done!
Go TECO, Go!
(0)
(0)
Scroll down for more posts ▼