NexGold Advances Drilling Progress at Goldboro Project

Exciting Developments at the Goldboro Gold Project
NexGold Mining Corp. (TSXV: NEXG; OTCQX: NXGCF) is making strides with its ongoing drill program at the Goldboro Gold Project. The company is currently conducting a 25,000-meter diamond drilling initiative, aimed at refining geological models and enhancing resource estimates. The project is centered on infilling key areas of the open pit mineral resource, which is essential for boosting both geological accuracy and grade continuity.
Drilling Program Overview
As part of this ambitious drilling project, NexGold is currently utilizing two diamond drills, and the completion of the drilling is expected soon. Results from this program are crucial as they will contribute to the upcoming update of the mineral resource estimate. The addition of new assay data and increased data density in critical areas is anticipated to yield positive outcomes for NexGold’s planned feasibility study.
The Role of Assay Data
The latest round of assay results from 11 diamond drill holes, totaling over 3,000 meters of drilling in the proposed west pit, is already building enthusiasm among stakeholders. Notably, these results reflect significant gold intersections, indicating that the current geological model successfully predicts gold mineralization in several areas.
Noteworthy Drill Intersections
Among the key findings from the drilling program, several notable intersections stand out:
- 1.60 g/t gold over 36.80 meters (from 271.20 to 308.0 meters), including 53.57 g/t gold over 0.60 meters in drill hole BR-25-504.
- 0.83 g/t gold over 32.55 meters (from 234.50 to 267.05 meters), including 6.00 g/t gold over 1.60 meters in drill hole BR-25-504.
- 0.61 g/t gold over 21.80 meters (from 209.00 to 230.80 meters), including 6.06 g/t gold over 0.60 meters in drill hole BR-25-507.
- 0.91 g/t gold over 12.30 meters (from 238.60 to 250.90 meters), including 1.42 g/t gold over 7.20 meters in drill hole BR-25-507.
- 2.47 g/t gold over 4.65 meters (from 266.55 to 271.20 meters), including 9.55 g/t gold over 1.00 meter in drill hole BR-25-484.
- 3.36 g/t gold over 3.60 meters (from 205.40 to 209.00 meters), including 14.70 g/t gold over 0.80 meters in drill hole BR-25-484.
With these findings, NexGold confirms that its drilling activities continue to add substantial insight into gold distributions within the resource area.
Looking Ahead: Feasibility Study and Permitting
The integration of these new geological insights and assay results will serve as the foundation for an updated resource estimate projected for the second half of the upcoming year. As the feasibility study progresses, it remains crucial for NexGold to align its technical studies with permitting timelines.
Community and Sustainability Commitment
NexGold Mining Corp. is not only focused on resource development but also committed to fostering strong relationships with local communities and indigenous groups throughout the lifecycle of its projects. The company prioritizes creating sustainable economic opportunities and maintaining open communication with stakeholders.
About NexGold Mining Corp.
NexGold is a Canadian gold-focused mining corporation, with assets in both Canada and Alaska. The company's Goliath Gold Complex and Goldboro Gold Project represent significant developments in its portfolio, complemented by a number of other exploration projects and initiatives.
For further inquiries or to follow up on the latest updates regarding NexGold Mining Corp., please reach out directly to:
Kevin Bullock
President & CEO
(647) 388-1842
Orin Baranowsky
Chief Financial Officer
(647) 697-2625
Frequently Asked Questions
What is NexGold Mining Corp. currently focused on?
NexGold is concentrating on its 25,000-meter diamond drilling program at the Goldboro Gold Project to enhance mineral resource estimates.
What were the notable results from the recent drilling?
The latest assays revealed up to 1.60 g/t gold over 36.80 meters, highlighting significant gold intersections.
How many drill holes have been completed so far?
As of now, 42 drill holes have been reported, reflecting approximately 30% completion of the proposed drilling program.
What is the expected timing for the feasibility study?
The feasibility study is ongoing, with the goal of aligning it with upcoming permitting decisions.
How does NexGold engage with local communities?
NexGold is committed to meaningful dialogues and sustainable practices that foster economic opportunities and enhance community welfare.
About The Author
Contact Dominic Sanders privately here. Or send an email with ATTN: Dominic Sanders as the subject to contact@investorshangout.com.
About Investors Hangout
Investors Hangout is a leading online stock forum for financial discussion and learning, offering a wide range of free tools and resources. It draws in traders of all levels, who exchange market knowledge, investigate trading tactics, and keep an eye on industry developments in real time. Featuring financial articles, stock message boards, quotes, charts, company profiles, and live news updates. Through cooperative learning and a wealth of informational resources, it helps users from novices creating their first portfolios to experts honing their techniques. Join Investors Hangout today: https://investorshangout.com/
The content of this article is based on factual, publicly available information and does not represent legal, financial, or investment advice. Investors Hangout does not offer financial advice, and the author is not a licensed financial advisor. Consult a qualified advisor before making any financial or investment decisions based on this article. This article should not be considered advice to purchase, sell, or hold any securities or other investments. If any of the material provided here is inaccurate, please contact us for corrections.