KBR's Selection for Engineering Services
KBR (NYSE: KBR) has been selected to deliver detailed engineering design services for the Associated Gas Upstream Project Phase 2 (AGUP2), forming part of the Gas Growth Integrated Project (GGIP) under TotalEnergies' operation.
Strategic Collaboration
This decision comes on the heels of KBR's successful Front-End Engineering Design (FEED) work, a reflection of its strong bond with ENKA and TotalEnergies. It is a significant step in supporting the ongoing enhancement of Iraq's energy infrastructure.
Project Goals and Vision
With this award, KBR will provide a multi-discipline engineering design through its global centers. This capability enables ENKA to manage engineering, procurement, supply, construction, and commissioning for the central processing facility as part of the AGUP2 initiative.
Project Impact
Set to commence operations in 2028, the AGUP2 project aims to process oil and gas from the Ratawi oil field, targeting a production enhancement to 210,000 barrels of oil per day and 154 million standard cubic feet of gas per day. Moreover, it aims to eliminate routine flaring, playing a key role in Iraq’s transition to sustainable energy.
Years of Trust in Iraq
Jay Ibrahim, President of KBR Sustainable Technology Solutions, asserts, "KBR has been a trusted service provider in Iraq for over four decades. This milestone is a cornerstone in Iraq's energy future, integrating gas recovery, power generation, and efforts toward renewables to make the country self-sufficient in energy, accompanied by a pursuit of improved environmental sustainability."
KBR’s Expertise in Energy Solutions
KBR's vast expertise in gas processing, carbon reduction, and energy transition technologies positions it as an invaluable asset in advancing Iraq's decarbonization objectives while aligning with TotalEnergies' commitment to responsible energy production.
About KBR
KBR is dedicated to providing scientific, technological, and engineering solutions across the globe. The company operates with approximately 37,000 employees, contributing to complex and essential roles within 29 countries, fostering advancements in energy and environmental solutions.
KBR's Commitment to Clients
KBR consistently collaborates with clients worldwide to deliver technology, value-added services, and maintenance solutions, ensuring reliability in their operations. The company's motto, "We Deliver,” emphasizes their commitment to consistent performance and quality results.
The Gas Growth Integrated Project
The GGIP aims to streamline the development of Iraq's natural resources, enhancing the country's electricity supply. This multi-faceted initiative involves gas recovery from oil fields that currently flare excess gas, supporting electric power generation and revitalizing the Ratawi oil field. Additionally, the project proposes the construction of a solar farm with a capacity of 1 GWac and a seawater treatment facility.
Frequently Asked Questions
What is KBR's role in the AGUP2 project?
KBR is responsible for delivering detailed engineering design services as part of the Gas Growth Integrated Project operated by TotalEnergies.
When is the AGUP2 project expected to start operations?
The project is set to start operations in 2028.
What are the production targets for the Ratawi oil field?
The project aims to enhance oil production capacity to 210,000 barrels per day and 154 million standard cubic feet of gas per day.
How long has KBR been active in Iraq?
KBR has been a trusted service provider in Iraq for over four decades.
What is the overall goal of the Gas Growth Integrated Project?
The GGIP seeks to support the redevelopment of Iraq's energy infrastructure while focusing on sustainable energy practices and reducing carbon emissions.