Freeman Gold Corp Announces Successful Metallurgical Test Results
Freeman Gold Corp. (TSXV: FMAN) is excited to share the positive outcomes of its latest metallurgical testwork program conducted for the Lemhi Gold Project. This extensive program builds upon previous studies and showcases a significant advancement in Freeman's understanding of its gold extraction processes.
Highlights from the Metallurgical Tests
The metallurgical test results are impressive, demonstrating extraction rates of gold leach varying between 91.2% and 97.4%, averaging an exceptional 95.4%. This indicates strong recoveries across various deposit zones, confirming the potential viability of the Lemhi project.
Simple and Highly Efficient Processing
The testwork utilized a straightforward and conventional processing flowsheet which includes a primary grind of 120 µm P80, paired with standard CIL cyanidation. One of the standout features observed was the rapid leach kinetics, with most gold extraction occurring within just 24 hours, ensuring a quick turnaround in processing.
Optimized Reagent Usage
Throughout the testing, reagent consumption was effectively controlled, with averages of 1.28 kg/t for NaCN and 1.01 kg/t for lime. This moderate consumption reflects the project's economical nature while ensuring high extraction rates are maintained.
Comprehensive Program Overview
The metallurgical program included multiple facets to ensure a thorough understanding of the ore characteristics and processing requirements:
- 18 drill-core variability composites from the Main Pit.
- Composites from the Beauty Zone and the southwest zone.
- Production composites representing different stages of the mine life as per the preliminary economic assessment (PEA).
- Five reverse-circulation samples representing the core areas of interest.
In total, the testing investigated various parameters including head assays, mineralogy, gravity concentration, and cyanide leaching efficiency.
Exceptional Gold Extraction Performance
Gold extraction performance across all samples in 2025 has shown remarkable consistency, supporting the economic viability of the project. Results indicate an impressive Bond Ball Mill Work Index averaging at 16.4 kWh/t, underscoring the relative softness of the ore which simplifies processing procedures.
Cyanide Consumption and Environmental Compliance
The metrics regarding cyanide and lime consumption reinforce the anticipated environmental responsibilities, aiding in industry compliance. Cyanide destruction tests successfully reduced WAD cyanide from approximately 1,270 ppm to below 5 ppm, far exceeding typical discharge criteria.
Freeman's Vision for Future Development
Looking ahead, Freeman Gold Corp plans to integrate these remarkable metallurgical results into its ongoing engineering and mine planning. The company is committed to further optimizing the processing methods, ensuring the project progresses efficiently towards its future phase of technical studies.
About Freeman Gold Corp
Freeman Gold Corp is dedicated to developing its wholly-owned Lemhi Gold property, which sits on 30 square kilometers of promising landscape. With a NI 43-101 compliant resource estimate indicating 988,100 ounces of gold at an impressive grade, the company is focused on advancing the project towards realizing its full economic potential.
Frequently Asked Questions
What are the main highlights of the metallurgical test results?
The tests show gold leach extraction rates between 91.2% and 97.4%, averaging 95.4%, confirmed a conventional processing flowsheet, and moderate reagent consumption.
How does Freeman Gold Corp plan to use these results?
Freeman Gold aims to integrate these insights into their ongoing engineering initiatives and mine planning to enhance project development.
What is the significance of the Lemhi Gold Project?
The Lemhi Gold Project offers significant resources with a compliant estimate of 988,100 ounces of gold, positioning it as a promising venture within the gold mining sector.
Who is leading the development of the Lemhi project?
CEO and Director Bassam Moubarak leads Freeman Gold Corp, steering the development strategies for the project while focusing on economic viability and sustainability.
Where can I find more information about Freeman Gold Corp?
Further details can be explored through company releases and their commitment to mining advancements, focusing on the Lemhi Gold Project.