AECOM Leads Expansion of Walnut Creek Wastewater Treatment Plant
AECOM (NYSE: ACM), a prominent global infrastructure consulting firm, has been chosen as the main consultant by the City of Austin for a major upgrade of the Walnut Creek Wastewater Treatment Plant (WWTP). This project aims to improve both the operational efficiency and environmental impact of the facility, boosting its capacity from 75 million gallons per day (MGD) to an impressive 100 MGD. As Austin’s population keeps increasing, these upgrades will not only enhance the wastewater infrastructure but also protect the surrounding ecosystem.
Building Partnerships for Sustainable Solutions
Beverley Stinson, the CEO of AECOM’s global Water business, shared her excitement about the ongoing partnership with the City of Austin. "Being the industry’s leading Water consulting firm, we are dedicated to providing advanced treatment capabilities to the community," said Stinson. The firm has significant experience in efficient nutrient removal technologies, a key factor for boosting plant performance and improving the quality of the treated water to protect the environment.
Engineering Scope and Innovations
This project includes a comprehensive range of engineering services, such as process, mechanical, civil, electrical, and structural engineering, aimed at modernizing existing infrastructure. Major components of the expansion involve replacing outdated equipment, building a new 25 MGD treatment train, and developing a new 120-inch outfall line. Additionally, the project will provide wet weather treatment capabilities using advanced 100 MGD cloth filters and a flood wall, built according to the National Weather Service’s historic flood risk study.
A Commitment to Austin’s Development
Matt Crane, CEO of AECOM’s U.S. West region, pointed out the firm’s long-standing relationship with the City of Austin, highlighting their involvement in designing key water and wastewater treatment systems over the years. "Our expertise in complex treatment design will help ensure a resilient and sustainable facility that aligns with our Sustainable Legacies strategy," stated Crane. This strategy underlines the significance of making a positive, lasting impact through every project.
Modernizing Historical Infrastructure
The Walnut Creek Wastewater Treatment Plant was established in 1977, initially designed for a capacity of 18 MGD and has experienced three expansions, reaching its current capacity of 75 MGD by 2005. The upcoming upgrades are set to maintain smooth operations throughout the construction phase, ensuring the plant effectively continues to serve the community during this transition.
About AECOM
AECOM (NYSE: ACM) is widely recognized as a reliable infrastructure consulting firm, offering a broad array of professional services throughout the project lifecycle—from advisory and planning to design and construction management. The company’s expertise spans multiple sectors, including transportation, water, energy, and environmental services. Driven by a commitment to tackle complex challenges, AECOM aims to create a better world through technical excellence, equity, diversity, and adherence to environmental, social, and governance principles. In fiscal year 2023, AECOM's Professional Services business reported an impressive revenue of $14.4 billion.
Frequently Asked Questions
What is the goal of the Walnut Creek WWTP expansion?
The goal is to increase its capacity from 75 MGD to 100 MGD to meet the city’s growing demand while enhancing environmental sustainability.
What role does AECOM play in this project?
AECOM serves as the prime consultant responsible for providing engineering services to modernize and upgrade the wastewater treatment facilities.
How does the expansion benefit the community?
This expansion strengthens wastewater infrastructure, supports community growth, and protects the local environment.
What technologies will be implemented in the upgraded facility?
The facility will include advanced nutrient removal technologies along with state-of-the-art wet weather treatment systems.
When was the Walnut Creek WWTP originally built?
The Walnut Creek WWTP was originally constructed in 1977 with an initial capacity of 18 MGD and has seen several expansions since that time.